Category
Custom Sintered Metal Spur Gears Powder Metallurgy Metal Small Pinion Gear
Package Size 50.00cm * 40.00cm * 20.00cm Package Gross Weight 15.000kg 1. We have professional powder metallurgy product
Basic Info.
Model NO. | DYG2323-1 |
Item Name | Metal Powder Metallurgy Products Sintered Gears |
Applicable Industries | Machinery Repair Shops, Manufacturing Plant |
Process | Mold Shaping, Sintering |
Machinery Test Report | Provided |
Surface Finish | Steam Treatment |
Condition | New |
Place of Origin | Heyuan, China |
Type | Powder Metallurgy |
Certificate | Rosh |
After-Sales Service Provided | Online Support |
Density | 6.5-7.1 g/cm3 |
Customization | Available |
Bush Types | Flange/Sleeve |
Material | Metal Alloy, Fe, Cu |
Transport Package | Plastic Bag\Carton |
Specification | iron |
Trademark | OEM |
Origin | China |
HS Code | 8483900090 |
Production Capacity | 3000000pieces/Month |
Packaging & Delivery
Package Size 50.00cm * 40.00cm * 20.00cm Package Gross Weight 15.000kgProduct Description
Product type | sintered metal gears |
Material | Stainless steel,Steel(Iron,)Brass,Copper |
Tolerance | ±0.01mm |
Application | Tool industry |
Shape | Custom |
QC system | 100% inspection before shipment |
Payment terms | T/T at sight, Paypal, Western Union,etc. |
Lead time | 7-15 working days |
Why Choose Us |
1. We have professional powder metallurgy production equipment and team;
2. We can accompany customers to develop products;
3. Just send an idea that you want to try, you don't even need to know what powder metallurgy;
4. Our sales will reply you within 24 hours to confirm further details and give the estimated quote time;
5. Our team will evaluate your inquiry and provide our offer within next 1~3 working days.
Order Process |
Product Show |
Some Parts We Manufacture |
Structural Parts
Gears
About Us |
Design Tips: Powder Metallurgy Gears |
1. Radius > 0.25 mm is required to manufacture the die;
2. Helical teeth should feature a helical angle < 30º in order to limit side pressure on the punches;
3. Introduction of a draft angle > 5º in the upper diameter reduce the tooling cost;
4. The distance between tooth root and central hub diameter must be: > 3 mm (Robust Tooling).
The Powder Metallurgy Manufacturing Process |
FAQ |
Q: How can I get the quotation? |
A: Please send us information for quote: drawing, material, weight, quantity and request,w can accept PDF, ISGS, DWG, STEP file format. If you don't have drawing, please send the sample to us,we can quote based on your sample too. |
Q: What's your MOQ? |
A: In general 1000pcs,but can accept low quantity in some special conditions. |
Q: Do you provide samples ? is it free or extra ? |
A: Yes, we could offer the sample for free charge but do not pay the cost of freight. |
Q: What about the leading time for mass production? |
A: Honestly, it depends on the order quantity. Normally, 15 days to 20 days after your deposit if no tooling needed. |
Q: What if the parts are not good? |
A: We can guarantee good quality,but if happened,please contact us immediately, take some pictures, we will check on the problem,and solve it asap. |
Q: What is your terms of payment ? |
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment |